By Tetiana Tavlui, CEO of ISD Consulting
Standard project appraisal measures what an asset costs to build and what it earns once in operation. It is far less precise about what the economy loses when that asset stops working. A rail outage can break supply chains well beyond the affected line. A power failure can shut down water pumping and telecommunications. For governments working with tight budgets, these losses should weigh heavily in deciding which investments go first.
This issue ran through most sessions of the OECD Infrastructure Forum, held in Paris on 5–6 November 2026. Although the sessions covered different topics, from critical networks to political risk insurance, they kept coming back to the same issue. The risks identified during planning determine a project’s scope and cost, and therefore who is willing to finance it. In my work on public investment management with governments and international organisations, I have seen this link play out in many projects.
Resilience across networks
Greece’s experience with wildfires raised a governance problem many countries share. Where critical infrastructure is privately operated, public authorities and operators have to agree in advance on preparedness standards, information sharing and who is responsible when a disruption crosses sector boundaries. The session on flooding in East Africa showed the economic cost. When a road closes, access to hospitals, markets and repair crews is lost with it. An appraisal that counts only physical damage will underestimate the cost of failure and, by extension, the value of redundancy. In Rwanda, we also see that the economic cost of losing a road link is usually much higher than the cost of repairing it.
Discussions on rail corridors in Poland and the Baltic states added a defence dimension. They show why planners need to ask whether networks built for passengers and freight can also carry heavy equipment in a crisis. This brings axle loads, alternative routes and terminal access into civilian infrastructure planning. NATO’s 2026 Baseline Requirements for Resilience, published in September, give civil support to military operations a firm place in national planning.
Project preparation remains the main bottleneck
A recurring theme in the financing sessions was the distance between a government’s stated priorities and the projects that lenders can actually finance. Closing it requires credible feasibility studies, realistic demand forecasts and a clear answer to who pays for the service over its life. Public–private partnerships can help where risk allocation is clear and long-term payment commitments are affordable. Both conditions need to be tested before procurement, and the resulting contingent liabilities should be reflected in fiscal planning. In my experience, preparation is where most good projects stall, because the funds and skills needed to prepare them are scarce.
Municipalities face this problem most acutely, a point addressed on the subnational investment panel by Emily Sinnott of the European Investment Bank (EIB). The EIB’s 2024–2025 survey of 1,002 EU municipalities found that 56% plan to significantly increase investment in climate change mitigation and 53% in social infrastructure, while lack of finance and regulatory burdens continue to hold investment back. Grants can fund feasibility work that small municipalities cannot afford. Framework loans can bundle several small investments into a single programme. Capital grants can reduce borrowing needs where local revenues are insufficient.
What war-risk insurance has achieved in Ukraine
The political risk insurance session drew on the experience of the European Bank for Reconstruction and Development (EBRD), the World Bank Group’s Multilateral Investment Guarantee Agency (MIGA) and the U.S. International Development Finance Corporation (DFC). The EBRD’s €110 million Ukraine Recovery and Reconstruction Guarantee Facility, launched with Aon in December 2024, supports the return of reinsurance capacity to Ukraine, starting with inland cargo, motor vehicles and railway rolling stock. MIGA’s $9.1 million guarantee for the M10 Industrial Park in Lviv covers an investor’s equity and shareholder loan against war and civil disturbance for up to ten years. The EBRD facility helps keep goods moving now, while the MIGA guarantee supports an investment that will take years to pay back.
Insurance alone is not always enough. A logistics investor may proceed once a defined war risk is covered. A district heating utility faces a different constraint. Even with cover in place, affordable tariffs may not generate enough revenue to finance renewal, which makes the case for concessional finance or grants. Ukraine’s Single Project Pipeline gives the government a basis for prioritisation. Drawing on my work on public investment management reform in Ukraine, I would argue that the harder task now lies at municipal level: preparing proposals that show which services will improve, what they will cost to operate and how they will be funded over their lifetime.
Economic corridors and border procedures
Cyrille Pierre, France’s Permanent Representative to the OECD, presented the French G7 presidency’s approach to economic corridors, which links transport investment with trade facilitation, local industry and digital connectivity. The OECD report on the India–Middle East–Europe Corridor (IMEC), launched at the Forum, identifies missing cross-border rail links and capacity pressures at some ports. It also points to quicker gains, such as common data standards and electronic exchange of customs documents, that improve reliability before major construction is complete. For investors, the return on a port or rail upgrade depends on how quickly goods can move through the rest of the network.
Rebuilding around essential services
For countries rebuilding after a shock, appraisal should start from the services that households and businesses depend on. Take, for example, a Ukrainian municipality that needs to replace damaged heating capacity. It can restore a central plant or invest in distributed backup. The comparison should rest on how many households each option can serve during an outage, how quickly service can be restored, and what the municipality and its residents can afford over time. That evidence helps engineers and financiers decide what to build and where public support has the greatest effect.
At ISD Consulting, this is the work we do with public authorities and project sponsors in Ukraine and Rwanda: preparing investments that meet public priorities and can attract finance. After two days of discussions in Paris, I am convinced that resilience will increasingly shape which projects get financed.